M o r o c c o

THE SAFI THERMALE POWER PLANT

All projects
Hadover
2018

An innovative power plant

The Safi thermal power plant is the first in Africa to use ultra-supercritical technology. The aim is to significantly reduce CO2 emissions as well as lower fuel costs by increasing efficiency by 10% compared to conventional coal-fired power plants. Annual production at the plant covers 25% of national electricity demand.

As a result of its dual civil engineering and construction expertise, BYMARO was awarded the contracts for all 34 of the project’s buildings, representing a built surface area of 54,000 m2.

460 000 m³ of earthworks
152 000 m³ of concrete
15 000 of steel
01
rotate

Please rotate your device to landscape mode for a better experience